Project No Project Title Project Ref No. Development Owner/Client Main Contractor Contract Period Remark
P0701 Proposed Erection of a 4-Storey Grace Orchard School with Ancillary Facilities at Jurong West St.52   MOE Planar One & Associates Pte Ltd 25-08-07 to
31-10-07
Total Pile = 100 nos
Pile Dia = 800-1200mm
Penetration = 36m
             
P0702 Proposed Erection of a Block of 5-Storey Flats (16 units) at Sommerville Road   Private Residential CS Bored Pile System Pte Ltd 01-11-07 to
31-12-07
 
P0703 Indoor Sport Halls
(For 5 School projects)
1-Catholic High @ Bishan St 22
2-Ai Tong Primary @ Bright Hill Dr
3-Zhong Hua Primary @ Wolskel Rd
4-Raffles Girl Primary @ Hillcrest Rd
5-Fairfield Methodist Sec.@ Dover Rise.
  MOE Wang Fung Construction Pte Ltd 24-11-07 to
15-01-08
 
P0704 Indoor Sport Halls (For 5 School projects)
1-Yusoff Ishak Sec. @ Bukit Batok St 25
2-Henry Park Primary @ Holland Grove Rd
3-Hua Yi Sec. @ Jurong West St 42
4-Boon Lay Sec. @ Jurong West St 65
5-Unity Sec. @ Chua Chu Kang St 62
  MOE Precise Development Pte Ltd
01-12-07 to
20-01-08
 
P0801 Proposed Erection of a Condominium Housing Development Comprising a Block of 28 Storey Residential Flats (99 units) with Carparks, Swimming Pool and Communal Facilities on LOT 1159P, 681P, 682T, 1094N(PT) and 1126W(PT) TS28 at No.20 & 30 Surrey Road. A1525-
00006-2007- ST01
Private Condominium CS Bored Pile System Pte Ltd 15-02-08 to
15-04-08
 
P0802 Proposed Additions and Alternations Comprising a 8 Storey Dryer Tower Extension, Ancillary Factory Facilities at the 1st Storey and Ancillary Office at the 2nd Storey to Existing Single User Nutritional Manufacturing Facility. A840-00298- 2007 ST01 Factory Development Zap Piling Pte Ltd 26-03-08 to
30-06-08
 
P0803 New 65,000 CBM Storage Tanks at Penjuru Terminal Phase II Project. (Job Scope Involved Hacking of Existing RC Piles only)   Private Industrial Development JDC Corporation 5-04-08
to
15-05-08
 
P0804 Proposed Erection of 6-Storey Business Park Development (Single Tenant) with a Basement Carpark on LOT 10357W MK 027 at Changi Business Park Central 2, Changi Business Park Ave 3 and Changi Business Park Crescent. A779-00856- 2008 ST01 Factory Wee Hur Construction Pte Ltd 29-03-08 to
24-05-08
 
P0805 Proposed Erection of a Block of 19 Storey Flats (total 100 units) with Roof Terrace, Elevated Swimming Pool and Basement Carparks on LOT 1880N and 1878X MK 25 at Ipoh Lane. A0659- 00069-2005 ST01 Private Housing Emerald Construction Pte Ltd Start work from
5-05-08
to
31-07-08
 
P0806 ISH2A1 <Chongfu Primary School>
Proposed Additional and Alternations to Existing Chongfu Primary School Comprising Additional of an Indoor Sports Hall and Other Ancillary Works (Phase2) Package 2A at 170 Yishun Ave 6 MK 19 LOT961A
A1430- 01610-2007 ST01 MOE Wang Fung Construction Pte Ltd Start work from
15-06-08
to
14-08-08
 
P0806 ISH2A2 <Christ Church Secondary School>
Proposed Additional and Alternations to Existing Christ Church Secondary School Comprising Additional of an Indoor Sports Hall and Other Ancillary Works (Phase 2) Package 2A at Woodlands Drive 17 MK 13 LOT 5419C
A1430- 02610-2007 ST02


 

ISH2A4<Riverside Secondary School>
Proposed Additional and Alternations to Existing Riverside Secondary School Comprising Additional of an Indoor Sports Hall and Other Ancillary Works (Phase 2) Package 2A at 3 Woodland Street 81 MK 13 LOT 01392T
A1430- 04610-2007 ST01 MOE Wang Fung Construction Pte Ltd Start work from
15-06-08


ISH2A5 <Serangoon Garden Secondary School>
Proposed Additional and Alternations to Existing Serangoon Garden Secondary School Comprising Additional of an Indoor Sports Hall and Other Ancillary Works (Phase 2) Package 2A on LOT 99455L MK 18 at Serangoon North Ave 1

A1430-
05610-2007
ST01




**P0807 Proposed Extension to Choa Chu Kang 230KV Substation Building on LOT 1529X MK 10 at 91 Choa Chu Kang Road A1194- 00653-2007 ST04 Singapore Power Ltd CS Bored Pile System Pte Ltd Start work from
15-06-08
to
14-01-09
Total Pile = 280 nos
Pile Dia = 1000mm
Penetration = 25m
**P0809 Circle Line Stage 2 Contract 823 Paya Lebar Interchange Station A1738- 00001-2002 ST12 LTA Lum Chang Building & Construction Pte Ltd 20-09-08 to
19-10-08
Pile Dia = 800 nos
Penetration = 65m
P0810 Proposed Erection of a Block of 15-Storey Residential Flats Development (total 51 units) with a Basement Carpark and Swimming Pool on LOT0 755P TS 26 at Keng Chin Road/Ewe Boon Road A659-00097- 2007-ST02 Private Condominium CS Bored Pile System Pte Ltd Start work from
15-0720-08
to
1411-20-08

Pile Dia = 600-1200mm
Penetration = 55m
P0811 Proposed Erection of 6 Blocks of 8-Storey Multiple User Light Industrial Factory Buildings (912 units) with 2 Nos Staff Canteens and Basement Carparks and a Block of 3-Storey Single User Light Industrial Terrace Factories (6 units) and Basement Carpark on LOT 16668X MK 18 (URA Land Parcel) at Sin Ming Lane A644-00071- 2007-ST01 Private Factory Yee Hong Pte Ltd Start work 28-07-08 to
27-01-09
Total Pile = 1000 nos
Pile Dia = 600-1800mm
Penetration = 65m
P0812 Proposed Erection of a Condominium Housing Development Comprising 2 Blocks of 5-storey with Attic Residential Flats (total 78 units) with Sub-Basement Carparks, Swimming Pools and Clubhouse on LOT 2912M, 2914V, 5955P, 6477C, 6478M, 7149L and 7150N MK 26 at Lorong K Telok Kurau A1536-00005- 2007-ST02 Private Condominium Sim Lian – Koru Bena JV Pte Ltd Start work 28-07-08 to
27-10-08
Total Pile = 300 nos
Pile Dia = 800-1200mm
Penetration = 64m
P0813 Proposed New Erection of a 12-Storey Multi User Light Industrial Factory Building (Total 13 units) on LOT 99819A MK 24, at 31 Harrison Road(S) 368027 A1679-00161- 2008ST01 Private Factory Koh Electronic Technology Pte Ltd 30-07-08 to
29-09-08
Total Pile = 37 nos
Pile Dia = 800-1200mm
Penetration = 37m
**P0814 Proposed Public Housing Development Comprising 4 Blocks of 16-Storey Residential Buildings (Total 412 units) with Community Facilities, Multi Storey Carpark, Precinct Pavilion and ESS at Bukit Panjang Neighbourhood 4 Contract 13   HDB Precise Development Pte Ltd Start work from
15-08-2008
to
14-01-2009
Total Pile = 800 nos
Pile Dia = 600-1000mm
Penetration = 34m
**P0816 Proposed New Erection of Public Housing Development Comprising of 4 Blocks of 13-Storey Residential Building with 1 Block of 4 Storey Multi Storey Carpark, ESS and Community Facilities at Yishun Ave 11/ Yishun Ring Road.   HDB Ningbo Construction Co.,Ltd Start work from
22-10-2008 to
21-04-2009
Total Pile = 900 nos
Pile Dia = 600-1000mm
Penetration = 42m
P0818 Proposed Public Housing Development Comprising 2 Blocks of 10 Storey Residential Building (Total 378units) and 1Block of ESS at Tampines Street 22   HDB Ken Pal (S) Pte Ltd 28
Oct 2008 to
27 Feb 2009
Total Pile = 400 nos
Pile Dia = 600-1200mm
Penetration = 42m
P0819 Proposed Erection of New 5 Storey Institutional Building with 2 Basement on LOT257P TS 20 at 7 Armenian Street A539-00005- 2005-ST02 Church Huason Construction Pte Ltd 4
Nov 2008 to
4 Jan 2009
Total Pile = 200 nos
Pile Dia = 600mm
P0901 Proposed Re-Development of Chuay Hui Ling Club to a 4-Storey Community Building with Attic and 3 Basement Carpark on LOT 00053V PT, TS 28 at 190 Keng Lee Road A0814- 00011-2006- ST01 Chui Huay Lim Club K-INC Konstruct Pte Ltd Jan 2009 to
Aug 2009
Total Pile = 278 nos
Pile Dia = 600-800mm
Penetration = 42m
P0902 DTSS – River Valley Link Sewer Contract 2 Boring Works at Havelock Road   PUB Building Construction Co. (Pte) Ltd 6 May 2009
to
8 May 2009

P0903 Proposed Erection of a Block of 19 Storey Flats (Total 72 units) with Rooftop Swimming Pool, Basement Carparks and Shops at 1st Storey Level on LOT 3791P MK 25 at Guillemard Road A0659- 00090-2006- BP01 Private Condominium Precise Development Pte Ltd Aug 2009 to
Dec 2009
Total Pile = 350 nos
Pile Dia = 600mm
Penetration = 22m
Jet Grout = 3600m3
Grout column = 3675m
**P0904 Pipe Piling installation works at Marina Coastal Expressway C486   LTA Samsung C&T Corporation July 2009 to
Dec 2011
Total Pile = 1254 nos
Pile Dia = 1200mm
Penetration = 27-53m
P0905 Pipe Pile Driving at Marina Coastal Expressway C485   LTA Yong Nam Engineering & Construction Pte Ltd May 2009 to
Aug 2009
 
P0906 Additional Bored Piling Works for Tower Crane Foundation at Chui Huay Lim Club   Chui Huay Lim Club Precise Development Pte Ltd Aug 2009 Total Pile = 4 nos
Pile Dia = 800mm
Penetration = 34m
P0908 Guidewall Construction for Secant Pile Wall at Launch Shaft and Station Box and Kingpost Posts Installation for Downtown Line Stage 2 Contract 916, Beauty World Station
  1. Guidewall at Launch Shaft & Station Box
  2. Secant Pile Walls
  3. King Post Installation
  LTA McConnell Dowell Nov 2009 to
Dec 2011
  1. Penetration = 100m
  2. Total Pile = 930 nos
    Pile Dia = 880-1180mm
    Penetration = 23m
  3. Total Pile = 239 nos
    Pile Dia = 900mm
    Penetration = 24m
P0909 Proposed Multi-Storey Carpark at Tampines Street 21 Block 202A, Tampines Street 91 Block 921A including Temporary Surface Carpark at Tampines Avenue 5   HDB Anderco Pte Ltd Jan 2010
to
March 2010
 
 P1103  Proposed Public Housing Development at Yishun N4C3
   HDB  JF Foundation Pte Ltd
July 2011 to
Jan 2012
 
P1104
Proposed 2-Storey Bungalow at 18 Astrid Hill (Bukit Timah Planning Area)
  Private Residential
 CS Bored Pile System Pte Ltd
 Sept 2011
to
Dec 2011
 
P1105
Construction of Bedok Reservoir Station & Tunnel for Downtown Line Stage-3 at (C927) Bedok Reservoir
  LTA CS Bored Pile System Pte Ltd
Oct 2011
to
March 2012
 
P1106
Bored Pile & Steel Shaft at Test Bunker for Halliburton (Phase 1)
    CSBP
Oct 2011
to
Dec 2011
 
P1107
Bored Piling & Contiguous Bored Pile for ECO-Bridge Across BKE Linking Nature Reserve-ER256
 
Eng Lee Engineering Pte Ltd
Nov 2011
to
Feb 2012
 
P1108 Nursing Homes at Punggol East
    CSBP
Oct 2011
to
Dec 2011
 
P1109 Bored Piling Works @ No. 23 & 28 Mar Thoma Road
     CSBP
Dec 2011
to
March 2012
 
P1110
Bored Piling Works at Marina Coastal Express MCE 481
    L&M
Dec 2011
to
April 2012
 

** Notable Projects

Note: Last year we have secured total of 63 million contract value